Phillips 66 Drum Storage Facility Installation

Petrochemical,

Phillips 66 Drum Storage Facility Installation

The Williams Construction Team demolished the existing retaining slab of the old drum storage facility, installed drains and HDPE pipes to current lift station, then built on a new lift station. The team also installed three 1500 sf canopies over the new retention slab, dry deluge sprinkler system, new sprinkler pump house, new power service to drum storage facility, new drum rack system and security fencing.

Key Stats:

  • 7,000 Man Hours
  • Zero hours of lost time due to safety incidents