Phillips 66 Repair and Waterproof of Underground Tunnels

Petrochemical,

Phillips 66 Repair and Waterproof of Underground Tunnels

For this project, Williams Construction demolished all existing paving above the pedestrian tunnel to allow access for repairs to french drain system, backfill tunnel and utilities. The Williams Team installed sheet piles and structural framing for shoring system, waterproofing materials, backfill tunnels and new concrete paving above tunnels.

Key Stats:

  • 3,850 Man Hours
  • Zero hours of lost time due to safety incidents