Phillips 66 Soil Remediation

Petrochemical,

Phillips 66 Soil Remediation

For this project, Williams Construction removed all contaminated soil in a 160,000 sf area and hauled to an onsite location for proper storage. Once removed, our team excavated 2 feet below existing grade and installed new soil fill, with the last 10” being topsoil and sod.

Key Stats:

  • 3600 Man Hours
  • Zero hours of lost time due to safety incidents