Phillips 66 Waste Water Pond Installation

Petrochemical,

Phillips 66 Waste Water Pond Installation

The Williams Construction Team removed an 8’ deep pond sludge and installed a select fill to bring the pond bottom above the water table in the ground. The project included laying a concrete sloped wall round the pond and running proper power to the pond. A bentonite clay liner, lift station, backup generator and HDPE lines to the water inlet were also installed.

Key Stats:

  • 20,000 Man Hours
  • Zero hours of lost time due to safety incidents