SWEPCO Structural Steel Upgrades

Energy & Power,

This project utilized structural steel modifications to retrofit an air quality control system to an existing 528 megawatt coal fired power plant. Williams Construction’s certified welders used over 4,000 lbs of welding consumables and completed the job with zero failed welds.

  • Greater than 20% radiographic testing
  • 12900 man hours
  • Zero hours of lost time due to safety incidents