Data Center Concrete Pipe Trestle

Data Center,

Data Center Concrete Pipe Trestle

Description

This 10 week project featured the drilling of piers ranging from 48” to 72” in diameter and 30′ deep, the installation of 71 concrete pipe trestles and the installation of all necessary concrete columns topped with concrete beams. Concrete columns ranged from 14’-22’. Concrete beams ranged from 8’-11’ in size.

Key Stats:

  • 21000 man hours
  • Zero hours of lost time due to safety incidents