Williams relocated tooling fixtures and reconfigured work platforms associated with the Gulfstream G650 Program. The team also installed utility distribution structures to support compressed air and electrical services. Key Stats: 1000 man hours Zero hours of lost time due to safety incidents
This project involved the installation of a foundation system for a 250’-0” x 30’-0” skin mill in an existing, occupied building. The foundation system was five to seven feet thick with embedded wide flange beams at 2’-0” on center. Along each side and down the length of the foundation were conveyor trenches. These trenches were poured monolithic with the foundation. The pour was 720 cubic yards placed and finished in 14...
This annual project takes place during a plant shutdown and focuses on maintenance of the main paper production line, including changing out worn components such as dryer cans, steam joints, pulper equipment and product rolls. Key Stats: 5500 people Zero hours of lost time due to safety incidents
For this project, Williams Construction completed the installation of a new paper pulper, including all associated piping, conveyers, and supports. The project was very schedule sensitive and was completed on schedule. Key Stats: 3000 man hours Zero hours of lost time due to safety incidents
The Williams Construction Team installed a complete activated carbon injection system in a large coal fired power generating facility. This project included construction of structural steel foundations, storage silos, air compressors, air dryers, piping, pipe racks and product transport systems. The team also replaced the induced draft fan rotors and precipitator isolation dampers. Key Stats: 46800 man hours completed Zero hours of lost time due to safety incidents
This time sensitive project was completed in 12 days during a plant outage. This project involved heavy maintenance and parts replacements for a coal stacker reclaimer. Key Stats: 500 man hours Zero hours of lost time due to safety incidents
This project featured the installation of all concrete foundations for substation buss duct and breakers, containment pits with piers for 2 new transformers, 60” piers for lightning protection rods, grounding grid and high security fence. Key Stats: 13,700 Man Hours Zero hours of lost time due to safety incidents
For this project, Williams Construction converted an existing refining building to a state of the art lubrication research facility. All activities for this project were coordinated with the client through 10 phases, to ensure the research building could remain occupied and functioning throughout the entire project. The Williams Construction Team retrofitted the building to accept the HVAC upgrade by demolishing the existing air handler and structural steel platform to allow for...