Spirit AeroSystems Skin Mill Foundation

05/16/2018

This project involved the installation of a foundation system for a 250’-0” x 30’-0” skin mill in an existing, occupied building. The foundation system was five to seven feet thick with embedded wide flange beams at 2’-0” on center. Along each side and down the length of the foundation were conveyor trenches. These trenches were poured monolithic with the foundation. The pour was 720 cubic yards placed and finished in 14...

Phillips 66 101G HVAC Upgrade & Facility Build Back

05/11/2018

For this project, Williams Construction converted an existing refining building to a state of the art lubrication research facility. All activities for this project were coordinated with the client through 10 phases, to ensure the research building could remain occupied and functioning throughout the entire project. The Williams Construction Team retrofitted the building to accept the HVAC upgrade by demolishing the existing air handler and structural steel platform to allow for...